Download Print this page
Crown Boiler BWC150 Installation Instructions Manual

Crown Boiler BWC150 Installation Instructions Manual

Bwc series high efficiency gas-fired hot water direct vent condensing boilers

Advertisement

Quick Links

Advertisement

loading

Summary of Contents for Crown Boiler BWC150

  • Page 5 National Fuel Gas Code Standard for Controls and Safety Devices for Automatically Fired Boilers I=B=R...
  • Page 7 National Fuel Gas Code Example: A BWC225 and a water heater are to be installed in a room measuring 6ft – 3 in x 7ft with an 8 ft ceiling. The water heater has an input of 30000 BTU/hr: Total input in thousands of BTU/hr = (225000 BTU/hr + 30000 BTU/hr) / 1000 = 255 MBTU/hr Volume of room = 6.25 ft x 7 ft x 8 ft = 350 ft3   6LQFH  LV OHVV WKDQ  WKH ERLOHU URRP LV D FRQ¿QHG VSDFH...
  • Page 9 Example: A 3” vent system is planned for a horizontally vented BWC150 which has the following components: 2 ft vertical pipe 1 90 elbow 5 ft horizontal pipe 1 90 elbow 3 ft horizontal pipe 1 45 elbow 4 ft horizontal pipe 1 termination elbow...
  • Page 10 The Vent Option #1 column in Table 6.2a describes a horizontal direct vent system using 3” vent pipe. From this FROXPQ ZH VHH WKDW D %:& PD\ KDYH D YHQW OHQJWK RI XS WR IW 7KH ¿UVW  HOERZ DQG WKH WHUPLQDWLRQ HOERZ are not considered.
  • Page 25 National Fuel Gas Code...
  • Page 36 National Electrical Code...
  • Page 40 National Fuel Gas Code...
  • Page 43 U.125 0.SWT A.SWT 5.SWT 1.SWT 2.SWT 3.SWT...
  • Page 46 PArA Info Stby...
  • Page 51 Continuously Monthly Inspections: Annual Inspections and Service:...
  • Page 74 Table 2.2 shown on this page supercedes the original Table 2.2 shown on page 2 of the manual.

This manual is also suitable for:

Bwc225