No.
Part to be replaced
Reactor
13
Work procedure
1. Detachment
1) Remove the electric parts box cover and the bottom
plate (suction side). (see the 1.of No, ①, 1.of No. ⑥)
2) Remove the Fastons for the reactor leads (CN511,
CN510) from the fan control board.
3) Remove the screws A (3 pcs) for the reactor cover,
and slide in the arrow direction to remove.
4) Remove the screws B (4 pcs) to secure the reactor,
and remove the reactor from the reactor cover.
2. Attachment
1) Mount the reactor to the reactor cover.
(Screw B (4 pcs))
2) Reinstall the reactor cover in the same way as before
replacement.
(Screw A (3 pcs))
3) Pull the leads for the reactor into the electric parts box,
and connect to the fan control board in the same way
as before replacement.
- 99 -
Remarks
CN511
CN510
Screw A
Reactor
cover
Reactor
Screw B
Reactor assembly