No.
Part to be replaced
Electronic control valve
⑤
coil
Bottom plate (suction
⑥
side)
Work procedure
1. Detachment
1) Remove the electric parts box cover.
(see the 1. of ①)
2) Remove the screws (4 pcs), and remove the service
panel.
3) Disconnect the PMV relay connector.
4) While securing the electronic control valve body,
remove the electronic control valve coil by turning it.
2. Attachment
1) Attach the electronic control valve coil.
2) Re-connect the relay connector of the electronic
control valve in the same way as before replacement.
3) Attach the service panel.
4) Attach the electric parts box cover.
(see the 2. of No. ①)
1. Detachment
1) Remove the screws (11 pcs) to secure the bottom
plate (suction side).
(Screws locate under the cross slit on the heat-
insulating material)
2. Attachment
1) Screw (11 pcs) the bottom plate in the same way as
before replacement.
- 93 -
Remarks
Electronic control valve coil
connector CN82 (Blue)
Screw
Service panel
Electronic control coil
Service panel
Screw