Check After Installation And Operation Test - Toyotomi GAN-A28IVL User Manual

Wall mounted room air conditioners
Table of Contents

Advertisement

Available languages

Available languages

Check after Installation and Operation Test

Check after Installation
Items to be checked
Has the unit been fi xed fi rmly?
Have you done the refrigerant leakage test?
Is thermal insulation suffi cient?
Is water drainage satisfactory?
Is the voltage in accordance with the rated
voltage marked on the nameplate?
Is the electric wiring or piping
connection installed correctly and securely?
Has the unit been securely earthed?
Is the power cord specifi ed?
Is the inlet or outlet blocked?
Is the length of connection pipes
and refrigerant capacity recorded?
Operation Test
1. Before Operation Test
1. Do not switch on power before installation is fi nished completely.
2. Electric wiring must be connected correctly and securely.
3. Cut-off valves of the connection pipes should be opened.
4. All the impurities such as scraps and thrums must be cleared from the unit.
2. Operation Test Method
1. Switch on power and press "ON/OFF" button on the remote controller to start the opera-
tion.
2. Press MODE button to select the COOL, HEAT (Cooling only unit is not available), FAN to
check whether the operation is normal or not.
Possible malfunction
The unit may drop, shake or emit noise.
It may cause insuffi cient cooling(heating)
It may cause condensation.
It may cause water leakage.
It may cause electric malfunction
or damage the unit.
It may cause electric malfunction
or damage the parts.
It may cause electrical leakage.
It may cause electric malfunction
or damage the parts.
It may cause insuffi cient cooling(heating)
The refrigerant capacity is not accurate.
30
GB
GR

Advertisement

Table of Contents
loading

Table of Contents