Installation - Bessey SBH Series User Manual

Smart induction heaters
Table of Contents

Advertisement

Available languages

Available languages

4. Installation

• Remove the packaging and place the induction heater on a non-ferrous, stable and level
surface. Put heaters with wheels on the brake to prevent the heaters from moving.
• Check the connection voltage against the rating plate on the unit.
• Each heater is equipped with a plug. As there is a wide variety of plug types, the provided
plug may not fit. In such cases, obtain a proper plug. It must be fitted by a qualified
electrician. There are different fitting options depending on the type of cable on the heater:
Fitting options SBH 301 - 303
120V/230V 1 phase heaters
Brown
Blue
Green/Yellow Ground
Fitting options SBH 304 - 305
400V/450V/500V 2 phase heaters
Brown
Black
Green/Yellow Ground
• Ensure that the power supply cable cannot come into contact with the workpiece to be
heated. Insert the plug in a socket outlet with grounded connection.
• Switch on the device by means of the main switch. The machine is starting up.
© Bessey Tools
120V/240V 1 phase heaters
Phase
Zero
480V/600V 2 phase heaters
Phase
Phase
Black
Phase
White
Zero
Green
Ground
Black
Phase
Black
Phase
Green
Ground
EN
FR
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbh 301Sbh 302Sbh 303Sbh 304Sbh 305

Table of Contents