Assembly - Grizzly G0707 Owner's Manual

24" x 37" blast cabinet
Hide thumbs Also See for G0707:
Table of Contents

Advertisement

Assembly

The machine must be fully assembled before it
can be operated. Before beginning the assembly
process, refer to Needed for Setup and gather
all listed items. To ensure the assembly process
goes smoothly, first clean any parts that are cov-
ered or coated in heavy-duty rust preventative (if
applicable).
To assemble machine:
With help of assistant, lay sheet of cardboard
1.
on floor to protect media blasting cabinet, and
place cabinet on its back.
Using #2 Phillips screwdriver, fasten (4)
2.
legs to underside of cabinet with (16) M6-1
x 12 cabinet screws and flange nuts (see
Figure 6).
Attach (2) side supports (see Figure 6) to left
3.
and right set of legs with (4) M6-1 x 12 cabi-
net screws and flange nuts.
x 16
Side
Support
Figure 6. Leg installation.
With help of assistant, stand blast cabinet up
4.
on legs.
Model G0707 (Mfd. Since 12/23)
Using (3) M6-1 x 12 cabinet screws and
5.
flange nuts, fasten hopper chute door to hop-
per, as shown in Figure 7. When secured,
latch hopper door closed.
Chute Door
Figure 7. Hopper chute door.
Using Phillips screwdriver, remove suction
6.
port baffle (see Figure 8).
Figure 8. Suction port baffle.
Using (4) M6-1 x 12 cabinet screws and
7.
flange nuts, fasten dust collector to rear of
cabinet, so suction port protrudes through
hole cut into back of cabinet (see Figure 9).
Plug dust collector in to in-line power sup-
8.
ply plug protruding from control box (see
Figure 9).
Hopper
Suction Port
Baffle
-17-

Advertisement

Table of Contents
loading

Table of Contents