17. Line up welded hinges on side doors with
cabinet hinges, then secure doors with (4)
door hinge pins (see Figure 13).
Figure 13. Installing side doors on cabinet.
18. Verify that plastic dust sheet is affixed to
inside of cabinet viewing window and light
window (see Figure 14).
Figure 14. Location of dust sheets.
19. Using fasteners pre-installed in cabinet and
doors, install doors latches, then receivers,
and adjust receivers so doors slightly com-
press seal when closed (see Figure 15).
Door Latch
Figure 15. Door latched closed.
Model G0707 (Mfd. Since 12/23)
Hinge
Pin
(1 of 4)
Right
Door
Dust
Dust
Sheets
Sheets
Receiver
20. Route blasting guns and hoses to eliminate
any kinks or binds (see Figure 16).
Figure 16. Blast gun and hose positioning.
21. Position foot pedal (see Figure 17) between
legs where it will be convenient to use. Pedal
may also be fastened to floor if unit will not be
moved.
Foot Pedal
Figure 17. Foot pedal positioning.
22. Pour desired amount of media into cabinet
through side door. DO NOT overfill.
23. Wait 24 hours for silicone sealant to fully
setup and dry. Otherwise, when machine is
turned ON and media blasting begins, seal
may be broken, causing leakage.
24. Inspect all seals, hose clamps, glove clamps,
and window seals for any potential leaks.
Correct as required.