20. Replace cover and tighten set screw to lock cover in place.
22. Loosen the remote fork housing cover screws and remove cover.
23. Pull approximately 4" (10.16 cm) of cable through conduit and strip
24. Connect factory supplied cable to terminals block as shown in Figure 11.
25. Check that all wires are held tightly in place by lightly pulling each conductor.
26. Reinstall the gasket, if necessary.
27. Replace cover and tighten screws to 60 in-lb (6.8 n-m) of torque.
CAUTION: IF THE UNIT WAS SUPPLIED WITH A GASKET AVOID FOLDING, CUTTING, OR TEARING
GASKET. DAMAGING THE GASKET CAN ALLOW MOISTURE TO ENTER THE ENCLOSURE AND
DAMAGE THE UNIT.
Figure 4. LP II Integral Enclosure with Cover Removed - STANDARD
Dip Switch SW1
Earth Ground
Note 1
Power & Ground
Connections
Notes:
1) For Safety, Properly Ground the Enclosure to an Adequate Earth Ground.
Power LED
Alarm LED
Main Relay
Connections
10
www.bindicator.com
/
" (4 to 5 mm).
3
16
LVP180613 Rev. B