1. INSTALL DUCTWORK
Plan where and how the ductwork will be installed.
Install proper-sized ductwork, elbow(s) and roof or wall cap for the type of blower you are installing. If using 6" (150 mm) round
ducts, use a transition. Use 2" (50 mm) metal foil duct tape to seal joints.
Roof cap
-
6" round duct
3%" x 10" duct
3%" x 10" to 6"
Arne
transition
Wall ca
Wall ca
HHOO1A
Lad
HHO014A
Lol
2. MEASURE THE INSTALLATION
Dimensions for the most common
installations are shown below.
We recommend to install the hood at a minimum of 20" (608 mm) from an electric range and at 24" (610 mm) from a
gas range.
For optimal performance, the hood should not be installed more than 30" (762 mm) from cooktop.
Cabinets
Cabinets
Hood
~~
Hood
sy
o s
30" maximum
20" minimum
clearance
clearance
(24" for gas)
Standard
Standard
36" height
36" height
cooktop
cooktop
HHOOI3A
HHOO12A