Download Print this page
FAAC DAAB EP105 Quick Manual For Commissioning
FAAC DAAB EP105 Quick Manual For Commissioning

FAAC DAAB EP105 Quick Manual For Commissioning

Automatic control unit
Hide thumbs Also See for DAAB EP105:

Advertisement

Quick Links

Quick guide for commissioning of swing gates
DAAB AUTOMATIC CONTROL UNIT EP105

Advertisement

loading

Summary of Contents for FAAC DAAB EP105

  • Page 1 Quick guide for commissioning of swing gates DAAB AUTOMATIC CONTROL UNIT EP105...
  • Page 2 QUICK GUIDE DAAB CONTROL UNIT EP105 Quick guide for commissioning of swing gates • COUTION The unit may only be connected by a qualified electrician, who accepts responsibility for ensuring that the electric connections have been carried out in accordance with the applicable standards and this instruction manual. Always disconnect the power supply when work is carried out in the control cabinet.
  • Page 3 QUICK GUIDE DAAB CONTROL UNIT EP105 • Commissioning of drive unit 2 Preparations: C999 is set to 2. Open half 1 and set L001 to 0 to keep drive unit 1 in open position Set C033 to 5, service position. Direction of movement: Start L002 to 4, hold-to-run without limits.
  • Page 4 FAAC Nordic AB Box 125, SE-284 22 Perstorp +46 435 77 95 00 www.faac.se, support@faac.se...