ANNEX SCOPE OF TESTING; TEST CRITERIA
Recommended scope of testing "Functional
test" (before initial or recommissioning)
Note:
Visual inspection must be carried out before the functional test
All parts of the system must be tested at least at the maximum working pressure that could be
achieved taking into account all intended applications:
- Are the hose lines and connecting elements free of leakage?
- Have all hose lines withstood the pressure?
Note:
The installed hose lines should not be made from used hoses or used press fittings which
have already been in use as part of a hose assembly!
Information on the service life of
L&W high pressure hoses
Version: 2020-06-01
Page - 11