Page 1
Installation Manual Mounting kits PR 6011/00S, ../03N, ../20S Translation of the Original Installation Manual 9499 053 29700 Edition 2.2.0 12/13/2022 Minebea Intec GmbH, Meiendorfer Str. 205 A, 22145 Hamburg, Germany Phone: +49.40.67960.303 Fax: +49.40.67960.383...
Page 2
This document is partially protected by copyright. It may not be changed or copied, and it may not be used without purchasing or written permission from the copyright owner (Minebea Intec ). The use of this product constitutes acceptance by you of the abovementioned provisions.
Mounting kits PR 6011/00S, ../03N, ../20S Table of contents Table of contents Introduction............................2 Read the manual................................. 2 This is what operating instructions look like ......................2 This is what lists look like............................2 This is what menu items and softkeys look like..................... 2 This is what the safety instructions look like......................
Mounting kits PR 6011/00S, ../03N, ../20S 1 Introduction Introduction Read the manual Please read this manual carefully and completely before using the product. This manual is part of the product. Keep it in a safe and easily accessible location. This is what operating instructions look like 1.
1 Introduction Mounting kits PR 6011/00S, ../03N, ../20S NOTICE Warning of damage to property and/or the environment. NOTICE indicates that damage to property and/or the environment may occur if appropriate safety measures are not observed. Take the corresponding safety precautions.
Intended use The mounting kits PR 6011/00S, ../03N, ../20S are intended for weighing tasks, and must only be used as such. The mounting kits PR 6011/00S, ../03N, ../20S are designed for installing the load cells PR 6211 (30–300 kg).
3 Recommendations for installation Mounting kits PR 6011/00S, ../03N, ../20S Recommendations for installation Load cell and constrainer arrangement Examples: Do not constrain this position. Constrainer Load application Possible direction of movement Minebea Intec EN-5...
Mounting kits PR 6011/00S, ../03N, ../20S 3 Recommendations for installation To ensure the required free moving space of the weighing facility, a maximum of 3 mounting kits with constrainer may be used to constrain a weighing object. Round containers are the exception (image ① and ②). In this case, any number of constrainers can be installed, provided that they are tangentially aligned.
Page 9
3 Recommendations for installation Mounting kits PR 6011/00S, ../03N, ../20S Assembly: Mount the threaded bar (1) so that it has sufficient free moving space in the drill hole. Lock the nuts (2) so that there is a remaining distance A* from the washer (3).
4 Specifications Mounting kits PR 6011/00S, ../03N, ../20S PR 6011/20S all dimensions in mm * M6 thread in lower plate for lift-off protection Technical data PR 6011/00S + PR 6011/20S PR 6011/00S PR 6011/20S Max. capacity of load cell 30…300 kg 30…300 kg...
Page 14
Mounting kits PR 6011/00S, ../03N, ../20S 4 Specifications PR 6011/03N PR 6011/03N Max. capacity of load cell 30…300 kg Permissible usable load max. 450 kg Compression under load 1 mm/2.25 kN Permissible temperature range -45 °C…+70 °C Short time temperature range -45 °C…+90 °C...
5 Installation Mounting kits PR 6011/00S, ../03N, ../20S Installation Prior to mounting 5.1.1 Preparing the foundation/substructure The foundation for the mounting kit must be horizontal (use spirit level), flat, and rigid for the intended loads. The load distribution on the available load cells must be as even as possible to prevent overload of the individual load cells.
Mounting kits PR 6011/00S, ../03N, ../20S 5 Installation NOTICE Stability of the weighing object. The rubber mounting kit must not be used for compensation of horizontal forces. NOTICE Welding or lightning strike current flowing through the cell can damage it.
Page 17
5 Installation Mounting kits PR 6011/00S, ../03N, ../20S Requirements: All threaded holes for the lower plate are available in the foundation/substructure (see Chapter 4.2). All threaded holes for the upper plate are available in the vessel lug/vessel foot (see Chapter 4.2).
Mounting kits PR 6011/00S, ../03N, ../20S 5 Installation 9. Connect an equipotential bonding conductor (supplied with the load cell) between the upper plate and the lower plate. Check mounting When all mounting kits have been installed, check them for proper mounting.
6 Cleaning Mounting kits PR 6011/00S, ../03N, ../20S Cleaning The mounting kit is easy to clean. It can be spray-washed with water (see IP68 specification). NOTICE Some cleaning agents may not be compatible with the mounting kit material. When using cleaning agents, ensure that their compatibility with the mounting kit material has been tested and approved (see Chapter 4.3).
Mounting kits PR 6011/00S, ../03N, ../20S 7 Disposal Disposal Our products and their packaging should not be disposed of in municipal waste (e.g. garbage can for recyclable packaging, garbage can for paper packaging, etc.). They can either be recycled by the customer themselves, providing this complies with requirements set out by electrical or electronic waste or packaging waste laws, or sent back to Minebea Intec at a charge.
Need help?
Do you have a question about the PR 6011/00S and is the answer not in the manual?
Questions and answers