Advertisement

Quick Links

Installation manual
Mounting kit with elastomer support PR 92/00N
Translation of the original installation manual
9499 053 92000
Edition 7.1.0
10/17/2019
Minebea Intec GmbH, Meiendorfer Str. 205 A, 22145 Hamburg, Germany
Phone: +49.40.67960.303 Fax: +49.40.67960.383

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PR 92/00N and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Minebea Intec PR 92/00N

  • Page 1 Installation manual Mounting kit with elastomer support PR 92/00N Translation of the original installation manual 9499 053 92000 Edition 7.1.0 10/17/2019 Minebea Intec GmbH, Meiendorfer Str. 205 A, 22145 Hamburg, Germany Phone: +49.40.67960.303 Fax: +49.40.67960.383...
  • Page 2 Any information in this document is subject to change without notice and does not represent a commitment on the part of Minebea Intec unless legally prescribed. This product should only be operated/installed by trained and qualiied personnel. In correspondence concerning this product, the type, name, and release number/serial number as well as all license numbers relating to the product have to be cited.
  • Page 3: Table Of Contents

    Mounting kit with elastomer support PR 92/00N Table of contents Table of contents Introduction............................2 Read the manual................................. 2 This is what operating instructions look like ......................2 This is what lists look like............................2 This is what menu items and softkeys look like..................... 2 This is what the safety instructions look like......................
  • Page 4: Introduction

    Mounting kit with elastomer support PR 92/00N 1 Introduction Introduction Read the manual Please read this manual carefully and completely before using the product. This manual is part of the product. Keep it in a safe and easily accessible location.
  • Page 5: Hotline

    1 Introduction Mounting kit with elastomer support PR 92/00N NOTICE Warning of damage to property and/or the environment. NOTICE indicates that damage to property and/or the environment may occur if appropriate safety measures are not observed. Take the corresponding safety precautions.
  • Page 6: Safety Instructions

    Intended use The mounting kits PR 92/00N are intended for weighing tasks, and must only be used as such. The mounting kits PR 92/00N are designed for installing the load cells MP 58, MP 79.
  • Page 7: Speciications

    3 Speciications Mounting kit with elastomer support PR 92/00N Speciications Equipment supplied 3.1.1 Mounting kit PR 92/00N Description Elastomer support Lower plate Mounting bolt (2×) Washer (2×) Spacer plate Quick guide (not shown) Minebea Intec EN-5...
  • Page 8: Dimensions

    Mounting kit with elastomer support PR 92/00N 3 Speciications Dimensions PR 92/00N All dimensions in mm * Ensure the spacer plate is in the correct position. Load cell MP 58 126.4 mm MP 79 127.3 mm EN-6 Minebea Intec...
  • Page 9: Technical Data

    3 Speciications Mounting kit with elastomer support PR 92/00N Technical data PR 92/00N Max. capacity of load cell 91…2.268 kg Max. compression when loaded 1.5 mm (at 22 kN) Permissible horizontal displacement 2.5 mm (at 1 kN) Permissible temperature range -20 °C…+65 °C...
  • Page 10: Installation

    Mounting kit with elastomer support PR 92/00N 4 Installation 4 Installation Prior to mounting 4.1.1 Preparing the foundation/substructure The foundation for the mounting kit must be horizontal (use spirit level), lat, and rigid for the intended loads. The load distribution on the available load cells must be as even as possible to prevent overload of the individual load cells.
  • Page 11: Installing The Mounting Kit And Inserting The Load Cell

    4 Installation Mounting kit with elastomer support PR 92/00N NOTICE Welding or lightning strike current lowing through the cell can damage it. All electrical welding on the weighing system must be inished before mounting the load cells. NOTICE Corruption of measurement results! The elastomer support must not be used to absorb transverse forces.
  • Page 12: 4.4 Check Mounting

    Mounting kit with elastomer support PR 92/00N 4 Installation 6. Connect an equipotential bonding conductor (not supplied with the mounting kit) between the vessel frame and the foundation. 7. Carefully place the vessel on the installed mounting kit and screw to the elastomer supports.
  • Page 13: Cleaning

    5 Cleaning Mounting kit with elastomer support PR 92/00N Cleaning The mounting kit is easy to clean. It can be spray-washed with water. For this purpose, spray the water jet from top to bottom and around the mounting kit. NOTICE Some cleaning agents may not be compatible with the mounting kit material.
  • Page 14: Disposal

    Mounting kit with elastomer support PR 92/00N 6 Disposal Disposal If the packaging is no longer required, please take it to your local waste disposal facility and/or a reputable disposal company or collection point. The packaging largely consists of environmentally friendly materials which can be used as secondary raw materials.
  • Page 16 Published by Minebea Intec GmbH | Meiendorfer Strasse 205 A | 22145 Hamburg, Germany Phone: +49.40.67960.303 | Email: info@minebea-intec.com www.minebea-intec.com...

Table of Contents