Removing The Transport Screws/Rods - Hisense 9 Series User's Operation Manual

Table of Contents

Advertisement

REMOVING THE TRANSPORT SCREWS/RODS

Before the first use of the appliance, transport screws/rods must be removed. A blocked
appliance may be damaged when it is switched on for the first time. Warranty shall be void in
cases of such damage.
A power cord clip
is provided here,
which should also be
removed.
Save the transport screws/rods in case you have to transport the appliance again later (to
reinstall the blocking screws/rods, follow the above procedure in reverse order).
Move aside the
hoses and use a
fitting spanner to
loosen the 4 screws
on the back of the
appliance by turning
them counter
clockwise, as
indicated by the
arrow. Loosen them
by approximately
30 mm (not
completely).
Pull all 4 shipping
bolts/screws
horizontally.
Pull out the
shipping bolts/
screws together with
the rubber and the
plastic part.
Cover the screw
holes with the
plastic caps. The
plastic caps are
supplied in the
accessory bag (the
support set) together
with the instruction
manual.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hwfs1214pHwfs1214pb

Table of Contents