Download Print this page

atd models Stone Workshop ATD010 Instruction Manual page 3

1:76 scale

Advertisement

4. Fold the tabs on Wall C inwards by 90 degrees. Repeat this step for Wall D.
5a. Detach Wall G and glue it to Wall C.
Ensure there is an even gap between the
i
crease lines on component C and the edge
of Wall G.
6a. Glue the tab on Wall C to Wall A, as per the
illustration below.
6c. Glue Wall B to the tabs on Wall C and D.
5b. Detach Wall H and glue it to Wall D.
Ensure there is an even gap between the
i
crease lines on component D and the edge
of Wall H.
6b. Glue the tab on Wall D to Wall A, as per the
illustration below.
7. Detach Wall I and glue to the inside of the
building. Repeat this step for Wall J.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Stone Workshop ATD010 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel