Summary of Contents for atd models Stone Boiler House and Chimney ATD011
Page 1
ATD011 - OO (1:76 Scale) Stone Boiler House and Chimney - Instruction Manual Tools Required Modellers Knife (with a fresh blade) Cutting Mat Modelling Glue (we recommend Deluxe Materials Roket Card Glue) Fine Tip Applicator Low-tac Masking Tape Clips / Clamps Tips Prior to starting your build, we recommend reading through the instructions to familiarise yourself with the build style of the kit.
Page 2
1. Detach component A and fold along the 2a. Detach component C and place it face down crease lines. Then apply glue to the tab and on your work surface. Then locate the tab on bond it to the inside of the wall. the right hand side, fold it over on itself and glue.
Page 3
5. Detach component E and glue it within 6. Detach component F and glue it within component A, ensuring that there is even component A, ensuring that there is even door surround visable from the outside. spacing left and right of the component and the top is flush.
Page 4
11a. Detach component L (x2) and glue them 11b. Detach component J and K and glue them together, back to back. within the building along with component L, as per the illustration below. Each truss should sit within a notch cut out on the corresponding wallst.
Need help?
Do you have a question about the Stone Boiler House and Chimney ATD011 and is the answer not in the manual?
Questions and answers