Quadra-Fire 43ST-ACC-AU Installation Manual page 19

Hide thumbs Also See for 43ST-ACC-AU:
Table of Contents

Advertisement

Slot to slide rod of Ash
Door Assembly through
Figure 19.1
Figure 19.2
Door latch with the
ash door rod locked
in place
Figure 19.3
Insert two bolts through ARS
Channel, Appliance, Gasket, and
ARS Door Assembly; secure with
two nuts.
Figure 19.4
19
Ash Door
Assembly
8 threaded
studs
Knob
Ash Door Rod shown
in installed position
Ash Removal
Spacer
Figure 19.5
Pedestal Kit and Ash Removal System (Cont'd)
Installing Pedestal Kit
1. Follow Begin installing the ARS System instructions
provided on page 18.
2. Slide pedestal over adapter on bottom of appliance and
secure with bolts from heat shield (Figure 20.1).
3. Install ARS Spacer on left hand side with one bolt using
Phillips head screwdriver.
4. Carefully stand appliance up and place in desired location.
Finishing the ARS Installation
1. Replace front bricks that were removed in step 1 of Begin
installing the ARS System on page 18 (Figure 18.2).
2. Install the ash drawer to pedestal base.
3. Install ARS access cover inside of ARS Channel that is
located inside the firebox (Figure 20.2).
CHECK BAFFLE BOARDS & CERAMIC BLANKET!
• Verify that the baffle boards and ceramic blanket are
in their proper locations.
• It is important that the baffle boards and ceramic
blanket are correctly installed for proper burn safety.
NOTE: If installing a floor installation of an outside air kit
on a Step Top model with a pedestal assembly you must
attach the enclosed cover plate with 4 screws to the back
of the appliance. Other wise you may discard this piece
(Figure 20.3).
7037-806A
CAUTION
05/21

Advertisement

Table of Contents
loading

Table of Contents