Download Print this page

Huawei SmartLi 3.0 Quick Start Manual page 3

Long-term backup power
Hide thumbs Also See for SmartLi 3.0:

Advertisement

4
Set the battery circuit breaker I1.
1
If the load of a single battery cabinet is greater than 50 kW and less than or
equal to 100 kW, set I1 to the MED position.
2
If the load of a single battery cabinet is less than or equal to 50 kW, set I1 to
the MIN position
One End
Cable
No.
Protocol
Component
Port
PE cable
SmartLi
PE
-
BAT+
-
DC
power
SmartLi
N
-
cable
BAT-
-
SmartLi1
PARALLEL1
-
SmartLi1
PARALLEL2
-
RS485 port on the
RS485
Modbus-RTU
Commun
ications
Monitoring
HTTPS
cable
interface
unit of the
FE
Modbus-TCP/
SmartLi
BIN
Modbus-TCP
COM
Modbus-RTU
EPO
-
Appearance
The following figure shows how to connect a communications cable between the
SmartLi and the integrated UPS (COM: 6 pins).
Communications cables between the SmartLi and other UPS models (COM: 8 pins) are
connected using standard network cables.
If more than eight SmartLi cabinets are connected in parallel, a maximum of four 15 m
parallel communications cables are supported.
1
Turn off the ready switch on
the BCU, remove the bolts that
secure the BCU, and pull it out
for about 10 cm.
The Other End
Port
Component
2
Protective
Install battery modules and filler panels.
PE
earthing (PE)
point
BAT+
Eight battery
modules
N
UPS
BAT-
PARALLEL2
SmartLi2
PARALLEL1
SmartLi3
upper-layer
Third-party NMS
management
system
Network port on
the upper-layer
WebUI
management
system
Network port on
ECC800-Pro/
the upper-layer
NetEco
management
Third-party NMS
system
COM1/COM2
UPS
-
EPO button
Pin
COM port
RS485 Port
FE Port
1
RS485_T+
RS485_T+
RJ_TX+
2
RS485_T–
RS485_T–
RJ_TX–
3
-
-
RJ_RX+
4
RS485_R+
RS485_R+
-
5
RS485_R–
RS485_R–
-
6
GND
GND
RJ_RX–
7
-
-
-
8
-
-
-
For W1 and W2, use any set of twisted-pair
cables and remove any excess wires. The same
goes for W3 and W4. Other redundant core
wires are cut off.
The cable colors in the figure are for reference
only. The actual cable colors may vary.
Installing Battery Modules
Seven battery
Six battery
Five battery
modules
modules
modules
3
3
Press the open buttons on the left of battery modules and open the wiring terminal
covers. Check the insulation performance of the battery modules.
Set a multimeter to the DC voltage mode and measure the voltage between the
ground point and the positive and negative terminals of each battery module
respectively. If the readings are less than 6 V DC, the insulation is good. Otherwise,
contact technical support engineers.
Insulation performance test points (using
eight battery modules as an example)
4
Install copper bars and cables.
After removing the insulation cap from a power cable, install the cable
immediately to prevent the exposed terminal from touching the shell, which
may cause sparks or burns.
To avoid short circuit, do not insert tools such as screwdriver directly into
threaded holes of positive or negative terminals of the battery module.
4
Excessive bolts will be used as spare parts.
Ground point
Positive terminal
Negative terminal
Ground point

Advertisement

loading

This manual is also suitable for:

Smartli-614v-100ah-fSmartli-537v-100ah-fSmartli-460v-100ah-fSmartli-384v-100ah-fSmartli-614v-100ah-sSmartli-537v-100ah-s ... Show all