7 7 Day Programme
8 7 Day Operation
1 Lift off transparent cover and the outer ring to expose the yellow and
green circumferential bands around the clock face. The yellow refers
to 7 day movement,
2 Turn the clock hand either clockwise or anticlockwise to line up the slots
between the green and yellow bands.
4
3 Slide the silver pin to the yellow band.
4 Replace the outer ring in reverse locating the silver pin into any of the
recesses provided on the ring. The slots on the timing will also engage
into the raised edges provided.
5 You may align the days to suit, i.e. I = Monday, II = Tuesday etc.
6 SET SWITCHING TIME – Insert the switching riders to the required
position using red for ON and blue for OFF.
9 7 Day ➔ 24 Hour Programme
1
0
Need help?
Do you have a question about the E269H-Synchronous and is the answer not in the manual?