Komatsu 15045 Operation & Maintenance Manual page 457

Hydraulic mining shovel
Table of Contents

Advertisement

MAINTENANCE
High-Strength Bolt Connections (continued)
Check condition and fastening of railings (01/02) and of
steps (03, 04, 05 and 23).
See details (A - D) for mounting parts arrangement.
Legend for illust. Z 20619
(A)
Mounting assembly for steps (03) to steel pipe, ver-
sion I
(B)
Mounting assembly for railing posts to steps (03)
(C)
Mounting assembly for steps (03) to boom welded
brackets
(D)
Mounting assembly for steps (03) to steel pipe, ver-
sion II
4.12 EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH
457

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc5500-6

Table of Contents