Komatsu 15045 Operation & Maintenance Manual page 197

Hydraulic mining shovel
Table of Contents

Advertisement

OPERATION
Information No. 1440:
(1445)
Information No. 1450:
(1455)
Information No. 1460:
(1465)
Information No. 1470:
(1475)
Information No. 1480:
(1485)
Information No. 1490:
(1495)
Information No. 1500:
(1505)
Information No. 1510:
(1515)
3.4 ELECTRONIC MONITORING AND CONTROL SYSTEM ECS
# Remark to Maintenance calls.
The maintenance calls integrated in the ECS
system are to be performed according to the
maintenance section in the operation and main-
tenance manual.
The routine visual checks, lubrication work and
engine maintenance are not called up. Please
pay attention to the Service Literature.
# Initial 250 h Maintenance
Perform initial 250 h Maintenance.
# Initial 1000 h Maintenance
Perform initial 1000 h Maintenance.
Perform also the 250 h/ 500 h Maintenance.
# Periodic 250 h Maintenance
Perform periodic 250 h Maintenance
# Periodic 500 h Maintenance
Perform periodic 500 h Maintenance.
Perform also the 250 h Maintenance.
# Periodic 1000 h Maintenance
Perform periodic 1000 h Maintenance.
Perform also the 250 h/ 500 h Maintenance.
# Periodic 2000 h Maintenance
Perform periodic 2000 h Maintenance.
Perform also the 250 h/ 500 h/ 1000 h Mainte-
nance.
# Periodic 3000 h Maintenance
Perform periodic 3000 h Maintenance.
Perform also the 250 h/ 500 h/ 1000 h Mainte-
nance.
197

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc5500-6

Table of Contents