Inspect And Plan - U-Line Echelon CO2175FF Installation Manual

Echelon series ice maker/refrigerator
Hide thumbs Also See for Echelon CO2175FF:
Table of Contents

Advertisement

General Precautions
Use this appliance for its intended purpose only and
follow these general precautions along with those listed
throughout this guide:
WARNING
SHOCK HAZARD — Electrical Grounding Required.
• Keep the unit unplugged throughout installation
except during testing.
• Never remove the round grounding prong from
the plug and never use a two-prong grounding
adapter.
• Never use an extension cord to connect power to
the unit.
• Always keep your working area dry.
CAUTION
• Use care when moving and handling the unit. Use
gloves to prevent personal injury from sharp edges.
• Do not lift the unit by the door or door handle.
• Do not install the unit behind closed doors or in any
way that would obstruct airflow to the front grille,
which may cause the unit to malfunction.
08/2006
CO2175FF — Combo® Ice Maker/Refrigerator

2 Inspect and Plan

You have received a carton containing your CO2175FF
Ice Maker/Refrigerator with a package inside
containing a Use and Care Guide, a Product
Registration Card and water connection parts.
Complete and mail the Product Registration Card or
register online at www.U-LineService.com. Once your
unit is installed, keep the Use and Care Guide and this
Installation Guide in a safe place for future reference.
Your unit is Black, White or Stainless Steel. Black and
White units have a reversible door with a slightly
contoured handle across the top. They come with a flush
mounted door panel that, when removed, will accept a
custom 1/4-inch thick door panel or a 3/4-inch thick full
overlay door panel. Stainless Steel units are covered with
a protective coating and have been ordered left- or right-
hand hinged. The Stainless doors are not reversible and do
not accept custom panels. Please carefully follow the
directions that apply to your unit and your intended design.
Tools/Materials Required
• Screwdrivers — slotted and Phillips head
• 1/4-inch Outside Diameter copper tubing and shut-off
valve for water supply line
• 1/4-inch thick door panel material and cutting tools
(Black or White units) (If installing a 1/4" Panel)
• Full Overlay Door Panel Kit (part number U-OL2175B —
Black or part number U-OL2175W — White), 3/4-inch
door panel overlay, cutting tools, drill and bits (Black or
White units) (If installing a 3/4" Full Overlay)
Inspection
Unwrap and inspect the unit on a flat, level surface
capable of supporting its entire weight.
Removing Protective Coating
(Stainless Steel Units Only)
When inspecting/installing a Stainless Steel unit, the
protective coating covering the unit must be removed
first. Start at a corner of the unit/door and pull back the
protective coating to remove it from the unit/door.
3
www.U-LineService.com

Advertisement

Table of Contents
loading

Table of Contents