DN1150 Corner Gas Fireplace
Information Sheet for Builders and Architects
S P E C I F I C AT I O N S
Heat Output
Gas Input
Gas Connection
Gas Type
Power Requirement
Operation
Appliance Weight
Connections
Clearance to Combustibles
Service Access Hatch
Cavity Wall Venting
Certification
Flue System
C A V I T Y I N S TA L L AT I O N O P T I O N
1
Build the chimney framework with consideration to flue pathways and meet the
minimum fireplace opening requirements (850mm H x 1320mm W x 365mm D).
Ensure a continuous base for the fireplace.
3
Install electrical, network connections, and gas supply.
Connect flue pipes to the fireplace and create the flue pathway to the terminal.
Connect Powerflue electrical cable at both ends.
*Refer to the Escea DN1150 Flue Selection Guide
6.6kw
33 MJ/hr (NG) 33 MJ/hr (ULPG/Propane)
Lower rear of fireplace - 1/2" BSPT Female
Natural Gas or Propane/ULPG
3 pin, 230V AC mains power within 1m
Thermostatic IR remote control
140kg
Lower rear of fireplace
Zero clearance from fireplace surfaces
Not Required
Not Required
Complies with AS/NZS 5263.1.3
Power direct-vent with 100/75mm flexible
and rigid PP flue pipes*
Flue Termination Locations
Minimum Flue Length
Max. Uninsulated Flexible Flue Length 8m
Max. Insulated Flexible Flue Length
Max. Flue Length
Flue Clearances to Combustibles
Flue Bends Allowed
2
Install the appliance into the preformed cavity opening and secure it to the base.
Ensure the fireplace is flush with the framework.
Provide mains power connection and an accessible isolation switch.
4
Attach wall linings to the framework and fireplace, maintaining a 5mm gap from the
fireplace trim. Follow the provided wall lining cutout dimensions above.
Complete the project by adding additional finishes or fixtures.
630704_3 DN1150 Corner Builders and Architects Information Sheet
Roof or wall mounted terminations
400mm
20m*
40m*
50mm for the first 1.5m of flue run
Max. 10 bends in any flue run

Advertisement

loading
Need help?

Need help?

Do you have a question about the DN1150 and is the answer not in the manual?

Questions and answers

Summary of Contents for Escea DN1150

  • Page 1 Follow the provided wall lining cutout dimensions above. Connect Powerflue electrical cable at both ends. Complete the project by adding additional finishes or fixtures. *Refer to the Escea DN1150 Flue Selection Guide 630704_3 DN1150 Corner Builders and Architects Information Sheet...
  • Page 2 C A V I T Y O P T I O N S F I N I S H E S Please Note: the DN1150 Gas fireplace is non-load-bearing, make sure to provide Use 10mm to 20mm deep wall linings or finishes, taking care to select materials sufficient support for any framework or building components above it.