Ibr Reverse Gate; Connecting Arm - SeaDoo GTX Series 2022 Shop Manual

Table of Contents

Advertisement

Section 06 STEERING AND PROPULSION
Subsection 02 (iBR, REVERSE AND VTS)

iBR REVERSE GATE

219100893-029-016_a
Removing the iBR Reverse Gate
1. Remove the iDF connecting arm retaining
screw.
2. Remove the iBR reverse gate retaining screws.
219100893-029-017_a
1. iBR reverse gate screw
2. Connecting arm screw
Installing the iBR Reverse Gate
The installation is the reverse of the removal pro-
cedure. However, pay attention to the following.
178
TIGHTENING TORQUE
iBR reverse gate screw
iDF connecting arm
screw
NOTICE
Allow 24 hours for threadlocker on
retaining screws to cure
iBR AUTO-CALIBRATION
Perform

CONNECTING ARM

smr2016-036-049
Removing the Connecting Arm
1. Remove iBR reverse gate. Refer to
VERSE GATE
subsection.
2. Remove the small Oetiker clamp retaining the
connecting arm bellows.
smr2016-036-020
7 N•m ± 1 N•m
(62 lbf•in ± 9 lbf•in)
27 N•m ± 1 N•m
(20 lbf•ft ± 1 lbf•ft)
+
LOCTITE 271 (RED)
(P/N 293 800 005)
procedure.
iBR RE-
219100963-018

Advertisement

Table of Contents
loading

Table of Contents