Maintenance Schedule - Champion 500137-N Operator's Manual

3 in. *7.6cm) chipper shredder
Table of Contents

Advertisement

500137-N - 3 iN. (7.6 cM) chiPPER ShREDDER
8. To remove the shredder blade (H), unscrew both the M8x25
bolts (G), washers ø8 (K), lock washers ø8 (L) and M8 lock
nuts (M). (III)
J
H
G
9. To remove the flail blades (O), unscrew the M10 lock nut (N)
from the shoulder pin (P). (IV)
10. Repeat for all 4 flail blades.
O
N
J
11. To remove the chipper blade (Q), unscrew M8 lock nut (M),
lock washer ø8 (L), washer ø8 (K) from the M8x25 bolt (G).
Each chipper blade is secured with two M8x25 bolts, lock
washer, washer and lock nut. (V)
12. Repeat for second chipper blade.
M
iii
K
L M
P
iV
G
Q
K
L

Maintenance Schedule

Follow the service intervals indicated in the following maintenance
schedule.
Service your chipper-shredder more frequently when operating in
adverse conditions.
Contact our Technical Support Team at to locate the nearest
CPE certified service dealer for your chipper-shredder or engine
maintenance needs.
EVErY 8 hourS or Prior To EaCh uSE
— Check engine oil level
— Clean around air intake and muffler
— Check air filter
— Check for loose or damaged parts
— Inspect all chute guards
FirST 5 hourS
— Change oil (break in period)
EVErY 25 hourS or PEr 1 monTh
— Chang engine oil
— Clean air filter
— Inspect all blades, sharpen if needed
EVErY 50 hourS or PEr 6 monThS
— Clean and adjust spark plug
— Check cooling fan
EVErY 100 hourS or PEr 1 YEar
— Check/adjust valve clearance*
— Clean fuel tank and filter*
EVErY 200 hourS or PEr 2 YEarS
V
— Check/replace fuel line
— Change spark plug
EVErY 250 hourS
— Clean combustion chamber
* To be performed by knowledgeable, experienced owners or CPE certified service
centers.
21
MAiNTENANcE

Advertisement

Table of Contents
loading

Table of Contents