5.1 Transport and storage

Transporting material
When loading/unloading or transporting the equipment at the workplace, you must use suitable transport and
lifting equipment (e.g. crane/forklift, truck). Ensure that components are lifted and transported carefully so
that they cannot fall, taking into account package size, weight, center of gravity and fragile parts. Use a forklift
or pallet truck to transport the package (figure 1).
Figuur 2
When the machine is out of the packaging, use a lifting strap or round
sling to transport the machine (figure 2).
Storage and stacking of packages
Packages containing the machine should be stored in a covered area, out of
direct sunlight and low humidity, at a temperature between -10°C and 40°C.
Stack a maximum of 3 packages on top of each other.
Unpack
When the machine is delivered, immediately check the package for possible damage due to transport and
storage. Check that the contents of the package are complete using the parts list and drawing. In case of
damage during transport, the customer must immediately inform the transport company. Packages should be
opened with attention to safety, keep a safe distance when opening tires and be careful not to let any parts
fall out of the package during opening.