Unpacking, Scope Of Delivery - KERN KFP V20 Installation Instructions Manual

Weighing bridge
Table of Contents

Advertisement

6.2 Unpacking, Scope of delivery

Danger for the back!
+
The weighing bridge is relatively heavy. Always use a suitable
lifting device to lift it out of the packaging or to transport it to
the required installation site.
CAUTION
Do not step under the suspended load, risk of injury!
+
1. Remove outer packaging and packaging material.
2. Remove covers
3. Assemble eye bolts
4. Lift the weighing bridge equally off the packaging material, see caution note.
Secure the weighing bridge that it cannot fall down when it is lifted.
5. Ensure that the contents of package is complete.
KFP V20_600-6000-IA-e-1514
Eye bolts
Covering weighing cell feet
Adjustable weighing cell feet
Covering Junction-Box
and
.
7

Advertisement

Table of Contents
loading

Table of Contents