Installation and wiring

The cover must be taken off and the bulb removed for installation and wiring:
}
Turn the cover to the right and pull it off upwards.
}
While applying slight downward pressure, rotate the bulb by approx. 90° to the right and
pull it out.
Fig.: Take off the cover and remove the bulb

Wiring

}
Perforate the stuffing box using a screwdriver.
}
Connect the supply voltage and the input signal that signals muting mode to the 3-pole
terminal.
}
Depending on the category required, connect one or both semiconductor outputs to an
evaluation device.
6 cores
Fig.: Wiring
Operating Manual PIT si1.2
21039-EN-05
CAUTION!
Wire the lamp when it is isolated from the power supply.