Gas Conversion; Step 1: Pressure Regulator - Bertazzoni MAS305GASNEV Installation, User And Maintenance Manual

Freestanding full gas ranges
Table of Contents

Advertisement

GAS CONVERSION

WARNING
Before
carrying
disconnect the appliance from gas and
electricity.
Gas conversion shall be conducted by a
factory-trained professional.
Call the customer service hotline to identify
a factory-trained professional near your
home.
The gas conversion procedure for this range includes 6
steps:
1) Pressure regulator
2) Surface burners
3) Oven burner
4) Broiler burner
5) Visual checks prior to closure of oven bottom panel
6) Adjustment of minimum setting.
The conversion is not completed if all 6 steps have not
been concluded properly.
Before performing the gas conversion, locate the package
containing the replacement nozzle shipped with every
range.
IMPORTANT
Each nozzle has a number indicating its
flow diameter printed on the body. Consult
the table number 1 for matching nozzles to
burners.
Save the nozzles removed from the range
for future use.
out
this
operation,

STEP 1: PRESSURE REGULATOR

The pressure regulator supplied with the appliance is a
convertible type pressure regulator for use with Natural
Gas at a nominal outlet pressure of 4" iwc or LP gas at a
nominal outlet pressure of 10" iwc and it is pre-arranged
from the factory to operate with one of these gas/pressure
as indicated in the labels affixed on the appliance, package
and Instruction booklet.
To convert the regulator for use with the other gas:
Unscrew by hand the upper cap of the regulator, remove
the white plastic attachment from the cap, reverse its
direction and screw it again firmly against the cap. The
white plastic attachment has arrows indicating the position
for natural gas (NAT) and LP gas (LP).
Screw by hand the metal cap in the original position on the
regulator.
A LP
B NAT
A
Fig. 21
B
Fig. 22
25

Advertisement

Table of Contents
loading

Table of Contents