2.2.9 Pressure Calibration Procedure
Power Cord
Power Switch
Make sure the connector is
connected to the pump and
rotated to LOCK ON position.
STEP-1:
Assure the voltage supplied
from power cord is correct.
STEP-2:
Switch on the power. The
normal power supply light will
be illuminated.
STEP-3:
Separate the top case.
STEP-4:
Let CN4 CONNECTOR on
AP07-2 PCB short circuit, and
press the POWER button on
control panel.
21
2008.01 V1.0