Park House Healthcare WARWICK User Manual

Electric bed

Advertisement

Quick Links

The Company
Founded in
, Park House Healthcare Ltd is recognised as one of the leading manufacturers of specialist pressure
relieving and pressure reducing equipment in the U.K.
Park House Healthcare Ltd has an extensive product portfolio and the facility to customise products to suit
customer needs whilst offering solutions in pressure care, postural management and moving and handling.
Employing over
full time staff at our
sq. ft state of the art Corporate Headquarters in West Yorkshire;
Park House Healthcare are proud to offer in-house manufacturing, a full product audit and decontamination
service and a network of distribution centres as part of our continued commitment to Customer Care.
hour care,
days a year dedicated internal personnel manage specific regions and divisions ensuring one on
one personal customer service at all times. With distributors in over
truly international company and we place important emphasis on providing high levels of customer care to ensure
we exceed customer expectations at all times.
Additional support nationwide is available through our service centres situated strategically around the country.
Park House Healthcare Ltd is a respected member of the British Healthcare Trade Association and has BS EN ISO
and EN
accreditation which is the specific quality standard for Medical Devices. All products are CE marked in
accordance with the European Directive
/
/EEC.
ISO Certificate No:
CE Certificate No: CA
Master Indemnity Assurance No: IFA
CCI
Due to its policy of continued development and
improvement, Park House Healthcare Ltd
reserves the right to amend any details
and specifications without notice.
© Copyright Park House Healthcare Ltd.
New Corporate Headquarters opened in October
countries, Park House Healthcare are a
Park House
H e a l t h c a r e
Park House Healthcare Ltd
Whitehall
Business Park,
Heathfield Lane, Birkenshaw,
West Yorkshire, BD
HW, UK.
Tel:
Fax:
Email:
sales@parkhouse-hc.com
International Tel:
+
( )
International Fax:
+
( )
International Email:
international@parkhouse-hc.com
Web:
www.parkhouse-hc.com
WARWICK ELECTRIC BED
User Manual

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the WARWICK and is the answer not in the manual?

Questions and answers

Summary of Contents for Park House Healthcare WARWICK

  • Page 1: User Manual

    Additional support nationwide is available through our service centres situated strategically around the country. Park House Healthcare Ltd is a respected member of the British Healthcare Trade Association and has BS EN ISO and EN accreditation which is the specific quality standard for Medical Devices.
  • Page 2 Troubleshooting Fault No motors working when hand control operated? Action Check connection to mains electric power supply, hand controlled and main control unit. Fault One motor does not work when button is pressed? CONTENTS Action Check connection between motor and control unit. WARNING - Any unauthorised modifications, adjustments or alterations will result in the warranty being invalid.
  • Page 3 During Operation Important Notice Before putting the Warwick Bed into operation, it is very important that the user In the case of any unusual noises or smells during operation, switch manual is read carefully. The manual contains important information for the safe the power off at the mains immediately.
  • Page 4 Ensure that all functions are in the lowered position (where possible), the power supply is switched off and the power cable is disconnected from the The Warwick Bed should only be assembled by a suitably competent person. mains by un-plugging. Ensure that all functions are not under any undue load and are free moving.
  • Page 5 Operation Instructions Assembly Operation of height and profiling functions Assembly of bed frame The head section, knee break and bed height are adjusted by Slide the side sections together as indicated in the diagram. pressing the appropriate button on the hand controller. The buttons are lavelled according to their function.
  • Page 6 Lower the head end of the mattress support onto the tubular cross At the other end of the bed, locate member at the head end of the lifter chassis, ensuring the location the top and bottom side rails to the cups are completely seated on the ends of the tubular cross member.

Table of Contents