2. SHIPMENT

2.1

Inspection on receipt

Packaging plate
A
A
Packaging plate
Before accepting the delivery, check:
- That the unit has not been damaged during transport.
- That the delivered material is as specified on the shipping
document when comparing the data with the package
plate 'A'.
In case of damage or faults:
- Immediately take note of the damage on the shipping
document and write: "Accepted with reservations for
evident loss/damage during transport".
- Contest with registered letter to the carrier and supplier.
2.2

Position of the equipment

A
Pocket for documents
A
Pocket for documents
Keep the documentation in a dry place to prevent deterioration,
for at least 10 years for future reference.
Any accessories that are not factory-fitted are supplied in
separate packages, with a relevant instruction sheet.
2.3

Equipment

Installation, operating and maintenance manual;
Wiring diagram;
Refrigerant diagram;
Water diagram;
List of parameters;
Declaration of conformity;
Technical data.
2.4

Storage

The room temperature in which the units are stored must be
between -20 / +50°C.
2.5

Handling

The equipment is designed for two lifting systems according to the
length of the machine.
It is prohibited to use the pipes or other components of the
machine as lifting points.
2 | Shipment
9