Full System Check - Champion 102006 Installation Manual

Service entry whole house automatic transfer switch (ats)
Table of Contents

Advertisement

WHOLE HOUSE AUTOMATIC TRANSFER SWITCH - ALL aXis CONTROLLER

Full System Check

1. Open Utility breaker for full system test, close breaker after
confirming all systems working.
2. After Utility breaker opens engine will start automatically.
3. aXis ATS control panel will reboot on Generator power and
control switching of latching relays.
4. Home is now powered by Generator. If Load Management
modules (LMM) have been installed, they will become active
after 5 minutes.
5. Close Utility breaker
6. System is now fully functional.
7. Replace the dead front by sliding it from the bottom up
into the cabinet; panel should index into the door latch
protrusions. Secure it to the dead front bracket with included
nut and stud.
8. Replace the door and secure with included hardware. It is
recommended to secure the door with a lock.
9. Return to HSB and verify the controller is in "AUTO" mode.
Confirm icons indicate Utility power is active, Utility side relay
is closed, and home is receiving power.
10. Close and lock HSB hoods return keys to customer.
NEMA 1 – This type of enclosed ATS is for indoor installations
only.
NEMA 3R – This type of enclosed ATS is similar to the indoor box,
except that it is a weatherproof enclosure and required for exterior
installations by code. The enclosure only has knockouts on the
bottom side for the enclosure, requires water tight fasteners/
grommets when installed outside per code. This enclosure can
also be used inside.
MODELS
®
18
INSTALLATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

102007102008102009102010

Table of Contents