Ats And Hsb Status Using Wi-Fi; Connecting The Load Management Systems; Teaching System - Champion 102006 Installation Manual

Service entry whole house automatic transfer switch (ats)
Table of Contents

Advertisement

WHOLE HOUSE AUTOMATIC TRANSFER SWITCH - ALL aXis CONTROLLER
9. Wireless network settings are not used at this time. The
default values (shown below) should not be adjusted.
Adjustment of this factory settings will require a certified
electrician to correct.
Wireless Network
Internet Service:
Direct Connect
OK
Web Page Mode:
AP Mode
AP Mode IP : 192. 168. 0. 90
CONFIRM NETWORK SETTINGS
10. The time, date, and exercise information have now been
setup for the aXis ATS and HSB. You can close your browser
and disconnect from the ATS Wi-Fi, or skip to step 2 in the
next section "ATS and HSB STATUS USING WI-FI".

ATS and HSb Status Using WI-FI

1. Using a WIFI enabled device, connect to the "Champion HSB"
WIFI network following steps 1, 2, and 3 from WIFI Setup
Method.
2. After loading the Home Standby Generator Settings page,
locate and click the
page.
3. You are now viewing the ATS and HSB status page. Items
such as voltage, frequency, current, etc. can all be viewed for
both utility and HSB power. All of the information is live. There
are three tabs located at the top of the page.
ATS, GEN, and LMM. Each tab will display the status for
the Transfer Switch, Home Standby Generator, or Load
Management Module(s) respectively.
4. When finished viewing the status of the ATS, Generator, and
LMM, close your browser and disconnect from the WIFI.
CANCEL SETTINGS
icon at the bottom right corner of the
MODELS
®

Connecting the Load Management Systems

The following instructions pertain only to aXis Controller
Management Modules (LMM) that use Power Line Carrier (PLC)
communication. If one or more LMM's are being installed on the
home, install them per the installation instructions included with
the LMM before continuing.

Teaching System

After installation and wiring are complete teach the ATS which
loads are attached by the following procedure. Teaching the
system is only required if 1 or more LMM's were installed OR if
AC1 OR if AC2 is being used to manage loads.
1. Turn Champion aXis Controller
breaker to the OFF position. Generator will start and run
automatically.
2. Confirm managed loads are all operating.
3. Press and hold the button marked "LEARN" for 8 seconds.
ATS will shutoff managed loads one at a time until all are OFF.
ATS will flash LED's indicating function in process.
4. After ATS has learned all loads the LMM units will be returned
to normal operation.
5. Installation configuration is now held in memory and will not
be affected by power outage.
6. Return UTILITY circuit breaker to the ON position. ATS will
transfer load back to utility and generator will cool down and
shut off.
7. Repeat this process if LMM units are added or removed from
the system.
1 2 3 4 5 6 7 8 9 10 11 12
17
INSTALLATION