Download Print this page

QualGear QG-TM-090-BLK Installation Manual page 3

Heavy duty fixed tv wall mount

Advertisement

Mounting to a Wooden Stud Wall
1a
Stud Finder
1
Using an edge-to-edge stud finder, find the
edges of the stud.
D
C
QG-TM- 090-BLK
3
Using the marking template (C) provided,
mark six holes for drilling on the centerline
of the stud.
3
For concrete wall mounting,
NOTE
follow Step 1b.
2
Using a level, mark the centerline of the stud.
90mm
90mm
( 3.5" )
(
)
3.5"
ø 6 mm
(ø 1/4")
4
Using a power drill and 1/4" drill bit, drill pilot
holes of 1/4" (6 mm) diameter and at least
3.5" (90 mm) depth.
D
Bubble Level
A
Wall Plate
5
Mount the wall plate (A) and tighten it with the
provided lag bolts (W-A) and D 8 washers (W-C) using
a socket wrench.
NOTE
Do NOT use power drill and do NOT over tighten the lag bolts.
WARNING
Make sure that mounting screws are anchored into the center of the studs. The use
of a stud finder is highly recommended.
Installers are responsible to provide hardware for other types of mounting situations.
Installers must verify that the supporting surface will safely support the combined
weight of the equipment and all attached hardware and components.
W-C
W-A
SKIP TO STEP 2
4

Advertisement

loading