May 2023
5. Replace the junction O-ring and liquid junction by sliding them
over the glass electrode.
Excess reference gel should flow out.
6. Replace junction cap by turning clockwise.
Hand tighten the junction cap only; do not use pliers to tighten
the cap.
7. Calibrate the sensor as described in
two buffer
Quick Start Guide
solutions.
Quick Start Guide
Calibrate a pH sensor with
29