Initial Gateway Setup; Connecting To Gateway For Setup - Cisco IEC6400 Installation And Configuration Manual

Table of Contents

Advertisement

Initial Gateway Setup

You can perform the initial gateway setup using either of the following methods:
• Using KVM, see
• Using CIMC GUI, see

Connecting to Gateway for Setup

Before you begin
In this procedure, connect a keyboard and monitor directly to the system for setup. This procedure will use a
KVM cable (Cisco PID N20-BKVM) or the ports on the rear panel.
Step 1
Attach a power cord to each power supply ports, and then attach each power cord to a grounded power outlet.
Wait for approximately two minutes to let the gateway boot to standby power during the first bootup. You can verify
system power status by looking at the system Power Status LED on the front panel. The system is in standby power mode
when the LED is amber.
Step 2
Connect a USB keyboard and VGA monitor to the gateway using one of the following methods:
• Connect an optional KVM cable (Cisco PID N20-BKVM) to the KVM connector on the front panel. Connect your
USB keyboard and VGA monitor to the KVM cable.
• Connect a USB keyboard and VGA monitor to the corresponding connectors on the rear panel.
Step 3
To connect with the Cisco IMC Configuration interface:
a) Press and hold the front panel power button for four seconds to boot the gateway.
b) During bootup, press F8 when prompted to open the Cisco IMC Configuration interface.
Connecting to Gateway for Setup, on page
Configuring the Cisco Integrated Management Controller, on page 10
Connecting to Gateway for Setup, on page 9
Configuring the Cisco Integrated Management Controller, on page 10
Connecting to Gateway Console Port, on page 14
Cisco IEC6400 Edge Compute Appliance Installation and Configuration Guide, Release 1.0.0
3
C H A P T E R
9, or
9

Advertisement

Table of Contents
loading

Table of Contents