HG-250 GenoLyte®
Tissue and Cell Lyser for Biological Applications
Quick Start Guide
For 115V/230V (41010-94)
How To Operate HG-250 GenoLyte
▪
Set up the homogenizer in a well ventilated,
unconfined space. The unit should be operated on
a flat, hard, stable benchtop due to the vigorous
motion and vibration generated during operation.
▪
Tilt the cabinet, and remove the two bolts on the
bottom. They hold the floating baseplate to the
cabinet for shipping.
▪
Remove the foam protector around the clamp
assembly inside the unit before turning it on.
Important: Cooling chamber only accepts Cole-
Parmer 2 ml vials and Standard 2 ml vials.
Step 1. Connect the power supply to the back of unit. Power On the HG-250 GenoLyte. Upon start-up, Cole-
Parmer will appear briefly on the display screen followed by RATE and TIME.
Step 2. Connect the circulating-chiller, attach the quick connect hoses to the HG-250 connector (left
and right side). The inlet port to the chiller is attached to the right side of the HG-250 GenoLyte
(right chiller connection) and the left chiller connection is attached to the outlet port from the chiller.
Chiller Setting Reference Table 1 (Guidelines for Run Protocol)
CHILLER
SETTING
-3°C (26.6°F)
-1°C (30.2°F)
1°C (33.8°F)
3°C (37.4°F)
Step 3. Lift the Lid by the Lid Handle. Add sample loaded vials to the Cooling chamber.
Close the clamp arm by pushing it down until it clasps the locking tab.
1300-87068QSG-1G, REV 2
Step 4. Close the lid.
RUNTIME
RATE
40 seconds
3000 rpm
35 seconds
3000 rpm
30 seconds
3000 rpm
30 seconds
3000 rpm
Clamp Arm
REST
CYCLE
15 seconds
2
15 seconds
2
15 seconds
3
15 seconds
3
Locking Tab
VIAL TEMPERATURE
(during run)
0° to 4°C
3° to 8°C
4° to 8°C
6° to 10°C
Cole-Parmer®
Lid
Control
Panel
Chiller
Connector
Need help?
Do you have a question about the GenoLyte HG-250 and is the answer not in the manual?
Questions and answers