11.2.3. Connected phases

Select the phase the charging station is connected to.

11.2.4. Phase rotation (only 3-phase chargers)

Selection of phase rotation is only informative and does not affect the charging station's operation.

11.2.5. Earthing system

The default setting for power supply is TN / TT network. If you connect the charger to an IT network, you have
to change settings for the charger accordingly.

11.2.6. Start Self test

The charging station performs a self test automatically at start-up.
During the self-test, several components and their proper function is tested.
The LED indicator is stable green during the self test.
The extent and duration of the self test depend on the charging station model.
If a critical fault is detected during the self test, the charging station will go to error state. You can see the
error code in the error log.

11.2.7. Factory reset

Here you can restore the charging station's factory settings.

11.3. Load Management Settings

In this menu you can find settings which are related to load management.

11.3.1. Property energy meter

In the submenus you can see the connected energy meter and modify the connectivity settings.

11.3.2. External control (dry contact)

Here you can change the settings for the override mode. The default setting for the contact is normally closed
(NC).
Charging is allowed when the contacts are closed.
Charging is not allowed when the contacts are opened.
LERAK131B-FRENIT/20230502
EV Charging Station
45 / 68