Download Print this page

Electrical Connections; Power Supply - LEGRAND Green'up One Installation Manual

Advertisement

Available languages

Available languages

6. Electrical connections

The voltage and current ratings including cable sizes must comply with national regulations. The system di-
mensioning must be done by a qualified electrical designer.
The default setting for the earthing system is TN / TT network. If you connect the charging station
to an IT network, you have to change the settings for the charging station accordingly.
You can change the settings of the charging station with the Charger Control Application.
Download the Charger Control application from Apple Store or Google Play.
Pair your mobile device with the charging station.
For more information see the User Guide chapter 14. Charger Control Application on pages 15 - 18.
Settings intended for qualified professionals only, see the chapter 11. Charger Control Application on pages
44 - 45.

6.1. Power supply

0 570 10 / 0 570 12:
Install a residual current device (RCD type F or A, 30mA) and a circuit breaker (MCB max. 16A or max.
32A depending on charging station model) to the supply line. In addition obey local regulations for the
power supply line.
These charging station models can be connected to an IT network.
Note! The load management features do not support the IT network installation.
Please contact your local representative for more information.
TN / TT network
PE
L1 L2
PE
L
N
Supply
Cu 2.5 - 10 mm²
LERAK131B-FRENIT/20230502
EV Charging Station
IT network
PE
L
N
PE L1 L2
Supply
Cu 2.5 - 10 mm²
33 / 68

Advertisement

loading