5.3. Wall mounting
•
Make sure that the wall is robust and stable. The mounting surface must be flat and vertical.
Installation steps
1.
Select applicable screws for the the wall material.
2.
Fasten the upper screw 1270 mm measured from the ground surface.
The plug holder will be at a height of 1200 mm.
LERAK131B-FRENIT/20230502
EV Charging Station
7
max. Ø5
31 / 68