70001022-MD250, 70002022-MD350, 71002022-MD550
71001022-MD350, 72001022-MD750, 72002022-MD1000
73001022-MD1000, 73001022-EC1200, 73002022-MD1000
73002022-EC1200
1 LEVEL KIT CONTAINS:
•
8 x Composite Timbers 4' Straight
•
16 x Stacking Brackets
•
8 x Anchor/Ground Level Serrated Stakes
•
32 x Plugs/Locking Nubs
•
8 x Caps
•
1 x Rubber Liner
•
1 x Underlayment
•
1 x Water Pump
•
1 x Pump Tubing
IMPORTANT: READ ALL
INSTRUCTIONS BEFORE
STARTING YOUR BUILD!
**NOTE
Stacking stakes should only be used
when stacking boards for water
garden application.
ONLY Stacking Stakes can stack!
Customer Service: 1800-914-9835 |
support@frameitall.com
© Frame It All. All Rights Reserved.
Water Garden
1 LEVEL
Required Tools:
•
Shovel
•
Levelling tool
•
Hammer
Recommended Tools:
•
Pond Safe Foam
Sealant
•
Grading Rake
Lap Pond
2 LEVEL KIT CONTAINS:
•
16 x Composite Timbers 4' Straight
•
32 x Stacking Brackets
•
8 x Stacking Stakes (**See Note Below)
•
8 x Anchor/Ground Level Serrated Stakes
•
64 x Plugs/Locking Nubs
•
8 x Caps
•
1 x Rubber Liner
•
1 x Underlayment
•
1 x Water Pump
•
1 x Pump Tubing
ASSEMBLY INSTRUCTIONS – Building the Frame
STEP 1:
Assemble the curved timbers by sliding one end of the timber into the channel end of one
of the brackets. Use plugs to lock the bracket in place.
Repeat this process on the other end of the timber flipping the bracket in the opposite
direction. (see example). Repeat for all remaining straight timbers.
How the Joints Work
Use a Cap to
complete the
top level.
Use anchor
stakes for
ground level
frames and
Use plugs to
stacking stakes
cover the holes
for additional
– two plugs are
levels.
required per
bracket (1 on
each side)
2 LEVELS
Use plugs (included)
to cover the holes on
both side of timbers
Use stacking
stake when
creating a multi-
level
Need help?
Do you have a question about the 70001022-MD250 and is the answer not in the manual?
Questions and answers