Setting Airflow - Trane S8X1A026M2PSAB Installer's Manual

Upflow/downflow/horizontal gas-fired, 1–stage and 2–stage induced draft furnaces with high efficiency motor
Hide thumbs Also See for S8X1A026M2PSAB:
Table of Contents

Advertisement

Setting Airflow

With all ductwork connected and a clean filter in place, measure the
External Static Pressure (ESP) of the unit in locations below. Use the
appropriate airflow table for the furnace and outdoor unit installed.
Measurements must be made prior to the evaporator coil, if equipped,
and after the filter.
Note: Check out fieldtechhelp.com to watch a short video.
Model
S8X1B080M4PSAB
S8X2B080M4PSAB
(a)
Exapmple 1, 2
(b)
Example 1
(c)
Example 2
Example 1: S8X2B080M4PSAB (Default Tap 7)
Cooling / HP
3 Ton Single Stage Outdoor
Total ESP = 0.7" W.C.
Required Airflow = 1050 cfm (3T x 350 cfm/ton)
New Tap Number = Tap 4
Example 2: S8X2B080M4PSAA (Default Tap 3 & 7)
4 Ton Two Stage Outdoor
18-CE04D1-1D-EN
Furnace Airflow (CFM) Vs. External Static Pressure (in. W.C.)
Tap
0.1
1
633
2
957
3
1220
4
1403
5
1524
6
1684
7
1700
8
1858
9
1967
Clean
Filter
0.3
0.5
297
800
719
1080
940
1298
1192
1428
1336
1574
1544
1625
1551
1790
1723
1898
1829
nd
Total 2
Stage ESP = 0.9" W.C.
st
Total 1
Stage ESP = 0.6" W.C.
nd
Required 2
Stage Airflow = 1400 cfm (4T x 350
cfm/ton)
st
Required 1
Stage Airflow = 1050 cfm (2
airflow x .75)
nd
New 2
Stage Tap Number = Tap 7 (no change)
st
New 1
Stage Tap Number = Tap 4
Evaporator
Coil
0.7
0.9
428
213
800
660
1087
(a)
981
1248
1164
1401
1337
1476
(b)
1401
(c)
1656
1589
1760
1691
nd
stage
57

Advertisement

Table of Contents
loading

Table of Contents