Setting Airflow - Trane S8B1D120M5PSBA Installer's Manual

Upflow/downflow/horizontal gas-fired, 1–stage and 2–stage induced draft furnaces with high efficiency motor
Hide thumbs Also See for S8B1D120M5PSBA:
Table of Contents

Advertisement

Setting Airflow

With all ductwork connected and a clean filter in place, measure the
External Static Pressure (ESP) of the unit in locations below. Use the
appropriate airflow table for the furnace and outdoor unit installed.
Note: Airflow tables are located in the Service Facts literature.
Measurements must be made prior to the evaporator coil, if equipped,
and after the filter.
Note: Check out fieldtechhelp.com to watch a short video.
Model
S8B1B080M4PS
S8X1B080M4PS
S8X2B080M4PS
This is an Example Airflow Table only. See Service Facts for complete Airflow data.
(a)
Exapmple 1, 2
(b)
Example 1
(c)
Example 2
Example 1: S8X2B080M4PS (Default Tap 7)
Cooling / HP
3 Ton Single Stage Outdoor
Total ESP = 0.7" W.C.
Required Airflow = 1050 cfm (3T x 350 cfm/ton)
New Tap Number = Tap 4
Example 2: S8X2B080M4PS (Default Tap 3 & 7)
18-CE16D1-1B-EN
Furnace Airflow (CFM) Vs. External Static Pressure (in. W.C.)
Tap
0.1
1
633
2
957
3
1220
4
1403
5
1524
6
1684
7
1700
8
1858
9
1967
Clean
Filter
0.3
0.5
297
800
719
1080
940
1298
1192
1428
1336
1574
1544
1625
1551
1790
1723
1898
1829
4 Ton Two Stage Outdoor
nd
Total 2
Stage ESP = 0.9" W.C.
st
Total 1
Stage ESP = 0.6" W.C.
nd
Required 2
Stage Airflow = 1400 cfm (4T x 350
cfm/ton)
st
Required 1
Stage Airflow = 1050 cfm (2
airflow x .75)
nd
New 2
Stage Tap Number = Tap 7 (no change)
st
New 1
Stage Tap Number = Tap 4
Evaporator
Coil
0.7
0.9
428
213
800
660
1087
(a)
981
1248
1164
1401
1337
1476
(b)
1401
(c)
1656
1589
1760
1691
nd
stage
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents