Section D - Installing the current transformers
IQ Battery 5P metering for
grid-tied systems
For grid-tied sites, IQ Battery 5P can be installed in the IQ Combiner 5/5C.
The IQ Battery CT needs to be installed on the L2 line of the IQ Battery with the arrow
pointing towards the breaker in the IQ Combiner 5/5C.
IQ Battery 5P
Risk of electrocution and equipment damage! Do not install CTs when
current is flowing in the sensed circuit. Always install CT wires in the
terminal blocks before energizing the sensed circuit.
IQ Combiner 5/5C Quick Install Guide
IQ Gateway Terminal Block
CU,
C,
AWG MIN
MEAS CAT III
OVC III
PD, B
OVC II
Blue
White
36