Clamp the red and black C1 CT on the load center feed wire Line 1
(matching the IQ Gateway's "L1" voltage terminal) with the CT arrow
pointing toward the load (away from the grid).
Clamp the purple and brown C2 CT on the load center feed wire
Line 2 (matching the IQ Gateway's "L2" voltage terminal) with the
CT arrow pointing toward the load (away from the grid).
Risk of electrocution and equipment damage! Do not install CTs when
current is flowing in the sensed circuit. Always install CT wires in the
terminal blocks before energizing the sensed circuit.
35
IQ Gateway Terminal Block
CU,
C,
AWG MIN
MEAS CAT III
OVC III
PD, B
OVC II
Brown
Purple
Red
Black
IQ Combiner 5/5C Quick Install Guide

Advertisement

Table of Contents
loading

Table of Contents