Section C - Wiring
Control (CTRL) wiring
between system components
Control wiring guidance for the Enphase Energy System:
Refer to the following wiring sequences to understand the position
of the header with termination resistor, wiring order, and drain wire
termination location.
NOTE: The cumulative length of CTRL wiring across the system
cannot exceed 250 feet to ensure the system operates as per
specifications.
NOTE: Ensure these guidelines are followed to avoid failures during
system commissioning:
•
One header with a termination resistor should be installed
on each component that is at the extreme end of the control
network.
•
The drain wire should only be terminated on one end of the
control wiring between system components.
Sequence 1a:
IQ Combiner 5/5C → IQ System Controller 3G → IQ Battery(s) 5P
IQ Combiner 5/5C
1
2
3
4
1
2
3
4
CTRL cable
IQ Combiner 5/5C Quick Install Guide
IQ System Controller 3/3G
Drain wire
Termination resistor
•
It is recommended that the drain wire be terminated at the
component from which control wiring for the section is
initiated.
•
The same conduits can be used for power and control wire
routing only when using an Enphase CTRL cable, i.e., CTRL-
SC3-NA-01.
IQ Battery 5P
IQ Battery 5P
28