Section D; Installing The Current Transformers - enphase IQ Combiner 5 Quick Install Manual

Hide thumbs Also See for IQ Combiner 5:
Table of Contents

Advertisement

Section D

Installing the
current transformers
1.
Production metering
The IQ Gateway printed circuit board inside the
IQ Combiner 5/5C is pre-wired at the terminal blocks for
power and production metering connections.
One solid-core current transformer (CT) is used for revenue
-grade production metering.
2.
Consumption metering
Two clamp-style current transformers (CT) are provided with
the IQ Combiner 5/5C for consumption metering.
The CTs are installed in the main load center for grid-tied
systems and in the IQ System Controller for grid-forming
systems.
3.
IQ Battery metering
One clamp-style current transformer (CT) is provided with the
IQ Combiner 5/5C for IQ Battery 5P metering.
The CTs are installed in the IQ Combiner 5/5C for grid-tied
systems and in the IQ System Controller for grid-forming
systems.
IQ Combiner 5/5C Quick Install Guide
32

Advertisement

Table of Contents
loading