PSS SB DI8O8
Check list for commissioning
Fill out when designing the plant and its configuration:
Information on the device address
Device
address
Output
Designed Safety-
as dual-
pole
output
yes
no
O
0
O
1
O
2
O
3
O
4
O
5
O
6
O
7
Date:......................................
Signed:..............................
1)
Wait until the user program sets the output to "1" (output's LED will light) and then generate a short
circuit between the output and 24 V. The required error reaction should then occur.
16
Excluded Required reaktion in
related
from
output
output
test
yes no
yes
no
case of error
Confirm
during
commissioning:
Address set
Error simulated
for safety-related
output
1)
Date:....................
Signed:............
Operating Manual