Horizon Fitness 7.8AT Owner's Manual page 16

Hide thumbs Also See for 7.8AT:
Table of Contents

Advertisement

Available languages

Available languages

ASSEMBLY STEP 6 - REMOVAL OF RED TRANSPORT CABLES
16
RED TRANSPORT CABLE
RED TRANSPORT CABLE
WARNING
FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN
INJURY!
Once the red transport cables have been detached from the treadmill,
high pressure springs can cause the lower base frame to spring open.
NEVER tip treadmill upside-down or on its side, and NEVER lift this unit
if red transport cables are not connecting the upper deck frame to the
lower base frame.
6.1 Ensure that treadmill is resting with all wheels supported by the floor.
6.2 On left side of treadmill, use the 5mm L-wrench (provided in box) to
remove the two bolts connecting the red transport cable to the upper
deck frame and the lower base frame.
6.3 Replace both bolts (one in the upper deck frame and one in the lower
base frame) and fully tighten to lock in place. Note that to prevent the
lower base frame from springing open during transport or disassembly
of the treadmill in the future, the red transport cable can be reattached
to the treadmill using these same bolts.
6.4 Perform same operation on right side of treadmill to remove the two
bolts connecting the red transport cable to the upper deck frame and
the lower base frame.
6.5 Replace both bolts and fully tighten to lock in place.
6.6 Save both red transport cables for future use by placing cables into
clear poly bag alongside the owner's manual.
6.7 When red transport cables are not installed, transport unit ONLY on the
ground, and ONLY after it is fully assembled and in the upright folded
position with the lock latch secured.

Advertisement

Table of Contents
loading

Table of Contents